RIB Digital Handover

Digital Handover assures a precise and a high quality of the as-built and the O&M documention data. Collection of data during the building process enables the possibility of having your demands to the O&M documentation kept in awe, and eliminate delay in the delivery process. After the handover, the O&M material vil be awailable in a databasestructure. By using BIM, data from the model can be transferred directly to the database. By using this method, valuable information can be reused, minimizing use of resources, which streamlines the process.